Building contractor: Bundesforste AG
Contracting client: HV Bau GmbH
Pressure pipe: 2.150 running meters (420 running meters PN16/20 of which is above-ground tunnel pipe installation)
Pipe bridge: steel pipe DN1000 17 running meters dimension, special spigots for connection to the GRP pipes including fixed and movable bearing, thermal insulation and metallic sheath
Dimensions: DN1000 PN6/PN10/16/20
Material: GF-UP/ GFK
Project execution: 2018