Hydropower plant Taurach

Building contractor:  Bundesforste AG

Contracting client: HV Bau GmbH

Pressure pipe: 2.150 running meters (420 running meters PN16/20 of which is above-ground tunnel pipe installation)

Pipe bridge: steel pipe DN1000 17 running meters dimension, special spigots for connection to the GRP pipes including fixed and movable bearing, thermal insulation and metallic sheath

Dimensions: DN1000 PN6/PN10/16/20

Material: GF-UP/ GFK

Project execution: 2018